DETAILED DESIGN

- Four Laning of Rau-Pithampur Road in the State of Madhya Pradesh on DBFOT basis.
- Client - M/s Rau Pithampur Infrastructure Pvt. Ltd.

- Development of Emergency Landing Facility from Km 1274+000 to Km 1277+600 section of Chilakaluripet – Nellore of NH-16 in the State of Andhra Pradesh on EPC Mode.
- Client - M/s KGK Engineers Pvt. Ltd.

- Four laning of Gorakhapur–Deoria section of SH-1 from Km 98.975 to Km 144.000 in the State of Uttar Pradesh.
- Client - M/s C.S. Infraconstruction Limited

- Construction Of Two Lane With Paved Shoulder Of Sendhwa-Khetia section Of Sh-36 From Km. 0+000 To 57+300 On EPC Mode.
- Client - MPRDC

- Rehabilitation & Up-gradation to Two lane with paved shoulders on Gulganj-Amanganj-Pawai-Katni section of NH-43 Extension in the State of MP on EPC Mode.
- Client - M/s Ramraj Hi-Tech Buildcon

- Two Laning Of Badwani-Bandhan-Ambapani- Sindhi-Khodhar-Silawad Road From Ch. 0+000 To Ch. 17.885 in The State Of Madhya Pradesh .
- Client - MPRDC

- Construction of Flyover at Sevashram Chouraha in Udaipur, Rajasthan
- Client - UIDT

-
Detailed investigation and preparation of DPR for construction of ROB on Chohtan Road Railway Phatak, Barmer (LC-328)
- Client - RSRDC

- Four laning of Azamgarh–Mau section of SH-34 from Km 270.000 to Km 316. 506 in the State of Uttar Pradesh.
- Client - UP PWD

- Four laning of Gorkhapur-Maharajganj section of SH-81 from Km 1.600 to Km 33.951 in the State of Uttar Pradesh.
- Client - M/s C.S. Infraconstruction Limited

-
Intersection At Km
97+100 On New 4 Lane Jhansi Bypass (Ch 90+300 To Ch 106+175) Of NH-25 In The
State Of Uttar Pradesh.
- Client - NHAI

- Construction Of Four/Two Lane From Darwha To Jawala Phata Rom Km. 42.000 To Km. 69.863 (Pkg-49c) In The State Of Maharashtra
- Client - MSIDC

- EPC AM-II (51A) Improvement to Sawangi Satefal Ner Babhulgaon Wadki Chargaon Antargaon Road Sh-317 Km 0/000 To 31/000 (Sawangi To Ner) Taluka-Ner, District-Yavatmal On EPC MODE
- Client - MSIDC

- Four Lane Connectivity work from Kaushambi Paryatak Sthal to Allahabad (Prayagraj) via Airport Length 42.6 Km.
- Client - UP PWD

- Widening and Strength 6/4 lane road from Varanasi to Mohan sarai Length= 11.18 Km.
- Client - UP PWD

- New Construction of Proposed 4 Lane Akbarpur Bypass = Length 11.34 Km.
- Client - UP PWD

- New Construction of proposed 4 lane Gosaiganj Bypass = Length - 5.5 Km.
- Client - UP PWD

- Widening and Strengthing 4 Lane Laxman Path Length 7.5 Km.
- Client - UP PWD

- Constructionof 4 Lane Bicholim Bypass on Karaswada to Usgaon, Project road starts at Ch. 0+000 and ends at Ch. 4+275 in the state of Goa
- Client - M/s Assmas Constructions Pvt. Ltd.

- Bangalore Cantonment- Whitefield Quardrupling - Conducting topographical survey and preparation of geometric design between Bangalore cantonment to Whitefield station
- Client - South Western Railway