TRAFFIC

- 6 lane access controlled Agra- Gwalior greenfield highway, starting from design km0+000 to design km 88+400 in the State of Uttar Pradesh, Rajasthan and Madhya Pradesh.
- Client – M/s PNC Infratech Ltd.

- Construction of Guwahati Ring Road including bridge over Brahmaputra River (Northern Bypass Baihata to Sonapur & Widening of existing NH-27 from Basistha to Jorabat section) in the State of Assam.
- Client – M/s PNC Infratech Ltd.

- TOT-17 (a) of Sultanpur-Lucknow section and b) Ayodhya- Gorakhpur section c) Lucknow - Ayodhya section of NH-28 in the State of Uttar Pradesh
- Client – M/s PNC Infratech
Ltd.

- Six laned Handia - Rajatalab Section (Km 712+900 to Km 785+544) of NH-2 in the State of Uttar Pradesh (TOT Bundle-9)
- Client – M/s PNC Infratech Ltd.

- Development of 8- Lane Elevated Flyover at Tier - 1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (From Km.12.190 to Km.42.109) section of (NH)-60
- Client – M/s GR Infraprojects Limited.

- Four Laning of Madurai-Ramanathapuram section of NH-49 in the State of Tamil Nadu.
- Client – M/s JMC Projects (India) Ltd.
.

- Six Laning of NH-19 from Panagarh to Palsit from km. 521.120 to km. 588.870 in the State of West Bengal on BOT (Toll) basis.
- Client – M/s PNC Infratech Ltd.

- Four Laning of Kashipur-Sitarganj section of NH-74 from Km 175.000 to Km 252.000 in the State of Uttarakhand and Uttar Pradesh
- Client – M/s Galfar Engineering & Contracting SAOG

- Four/Two Laning with Paved Shoulders of Rajasthan Border to Fatehpur and missing link upto Salasar section of NH-65 in the State of Rajasthan.
- Client – M/s Galfar Engineering & Contracting SAOG