Skip to Content

 PROOF CHECKING

  • Rehabilitation and Up-gradation from 2 lane to 4 lane of Lalganj – Hanumana section of NH-7 (Pkg-3) 
  • Client - M/s Dilip Buildcon Ltd.

  • Four Lane with Paved Shoulder of Tulungia-Jogighopa Bridge Approach section (package-5).
  • Client - M/s Rajendra Singh Bhamboo Infra Pvt. Ltd.

  • Four Laning of Pangare to Waranga Phata section from Km 134.500 to Km 174.645 (Design Chainage) of NH-161
  • Client - M/s Rajendra Singh Bhamboo Infra Pvt. Ltd.

  • Four lane configurations for the work of Peth Naka to Sangli Road from Km 0.000 to 41.250 Km section of NH-166H in the State of Maharashtra.
  • Client - M/s RRSM Infra Pvt. Ltd


  • Upgradation of Karanja – Kherda – Murtizapur section to Four Lane with paved shoulders from Design km 74.351 to km 102.331  in the State of Maharashtra.
  • Client – M/s RRSM Infra Pvt. Ltd.

  • Construction of 2 lanes with paved shoulder configuration of Shujalpur Bypass of length 10.470 Km (From Km 33+100 to 43+570 Design Length 10.47 Km) Section of NH-752C in the state of Madhya Pradesh under EPC Mode."
  • Client: M/s Apex Structures Pvt. Ltd.

  • Rehabilitation & Up-gradation of Intermediate Lane to Two lane with paved shoulders from Km 3.150 to 42.510 & White topping (inside Maksudangarh city in Length of 2.500 Km) on Biaora – Maksudangarh section of Newly declared NH-752-B in the State of Madhya Pradesh.
  • Client - M/s Rajendra Singh Bhamboo Infra Pvt. Ltd.


  • Rehabilitation and Up-gradation of road from Km 46.597 to Km 66.845 [Length:20.248Km] of Kanchanpur - Vaghmun Section of NH-44A to two lane with paved shoulders in the State of Tripura on EPC basis (Package-III]
  • Client - M/s Rajendra Singh Bhamboo Infra Pvt. Ltd.

  • Construction of Six lane elevated corridor from Km 508.000 to Km 513.15 on NH 66 in the State of Goa.
  • Client - M/s RRSM Infra Pvt. Ltd. 

  • Four Lane with paved shoulders configuration of Vodarevu - Chilakaluripet section of NH 167A Package-I.
  • Client - M/s RRSM Infra Pvt. Ltd.



  • Up-gradation of four lane/ two lane with paved shoulders configuration of Kalyan - Murbad - Malshej Ghat - Nirmal Road NH- 61.
  • Client: M/s RRSM Infra Pvt. Ltd.


  • Up gradation, Development and Maintenance of Rajgarh (Sadulpur) - Bhadra Section of SH-106 from km 0.000 to 59.481 to Two lane Standards in the Churu and Hanumangarh Districts in the State of Rajasthan.
  • Client – M/s Rajendra Singh Bhamboo Infra Pvt. Ltd.

and many more....        TOP