PRE BID ADVISORY

- Construction of Access Controlled Multi-Modal corridor from Navghar to Balavali in the State of Maharashtra on EPC mode. PKG 02, 03, 05, 06, 07, 08, 10, 11.
- Client – M/s Oriental Structural Engineers Pvt. Ltd.

- Four lane Bangalore Chennai Expressway in the State of Tamil Nadu on Hybrid Annuity Mode (Phase III-Package IV).
- Client – M/s Oriental Structural Engineers Pvt. Ltd.

- Eight lane access controlled Delhi Vadodara Expressway from (Design Ch. 32+000 to Ch. 65+000) of NH-148-N on EPC mode in the State of M.P.
- Client – M/s Reliance Infrastructure Ltd.

- Eight lane access controlled Delhi Vadodara Expressway from design Ch. From Km. 65.000 to Km. 94.500 of NH-148-N on EPC mode in the State of M.P.
- Client – M/s MKC Infrastructure Ltd.

- Four laning of Vidisha to Hinotiya Section of NH- 346 from km 0+000 to Km 27+000 in the State of Madhya Pradesh on Hybrid Annuity Mode (HAM).
- Client – M/s Oriental Structural Engineers Pvt. Ltd.

- Four laning from Design Ch 0.000 to 39.380 of Anantapur – Muchukota section of NH544D.
- Client – M/s Oriental Structural Engineers Pvt. Ltd.

- Four Lanning of Vodarevu - Chilakaluripet section Design Chainage 0.00 to 47.000 of NH 167A Package-I on EPC mode in the State of Andhra Pradesh.
- Client - M/s RRSM Infra Pvt. Ltd.

- Up-gradation to four lane/ two lane with paved shoulders of Kalyan - Murbad - Malshej Ghat - Nirmal Road NH- 61 from km 15/200 to Km 38/00 and from Km. 58/00 to Km 84/00 of NH-61 on EPC Mode
- Client: M/s RRSM Infra Pvt. Ltd.